Tutorialspoint

UPGRADE YOUR SKILLS | FLAT 10% OFF | Use: UPGRADE10

Project Schedule Management (Critical Path method)

person icon Fuad ABUTAHA

4.3

Project Schedule Management (Critical Path method)

Learn how to build a schedule network diagram, which is a visual sequence of how your tasks interrelate.

updated on icon Updated on Jul, 2026

language icon Language - English

person icon Fuad ABUTAHA

English [CC]

category icon Business,Project management,

Lectures -17

Duration -3.5 hours

Lifetime Access

4.3

price-loader

Lifetime Access

30-days Money-Back Guarantee

Training 5 or more people ?

Get your team access to 10000+ top Tutorials Point courses anytime, anywhere.

Course Description

Time management is the process of planning and controlling how much time to spend on specific activities. Good time management enables an individual to complete the project on time. In this training course, you will learn to build a schedule network diagram, which is a visual sequence of how your tasks interrelate. Network diagramming technique used to predict total project duration. Prioritize tasks based on importance and urgency. Setting time constraints for completing tasks helps you be more focused and efficient.

Topics:

Network Diagram

  • Introduction to Project Scheduling
  • Steps to Develop a Network Diagram
  • Linked Bar Chart (Activities Relationship)
  • Introduction to Critical Path Methods

Arrow Diagramming Method (ADM)

  • Introduction to Arrow Diagramming Method (ADM)
  • Draw Arrow Diagramming Method (ADM)
  • Earlies and Latest Time (ES, EF, LS, LF)
  • Calculate Earliest Time
  • Calculate Latest Time
  • Calculate the Float of Activities
  • Determine Critical Path
  • Example 2 (AOA)

Activity on Node (AON)

  • Introduction to Activity on Node (AON)
  • Draw Activity on Node (AON)
  • Calculate Earlies Time
  • Calculate Latest Time
  • Total Float (TF), and Free Float (FF)
  • Calculate Total Float (TF), and Free Float (FF)
  • Determine Critical Path

Example 2 (AON)

  • Draw a Network diagram for (AON)
  • Calculate Earlies Time
  • Calculate Latest Time
  • Determine Critical Path
  • Calculate Earlies Time using dates

Gantt chart

  • Develop a Gantt chart using numbers
  • Develop a Gantt chart using dates

Example 3 (AON)

  • Understand the question and the requirement
  • Draw a Network diagram
  • Calculate Earlies Time
  • Calculate the Latest Time and determine the critical path
  • Develop a Gantt chart using numbers
  • Develop a Gantt chart using dates

Who this course is for:

  • Project manager, who wishes to learn how to use the software to schedule and control projects.
  • Professionals who are preparing for the PMP certificate.
  • Construction Management Students
  • Civil Engineers.

Goals

At the end of the course, you will learn:

  • What is Network Analysis for project scheduling.
  • How to create a Work Breakdown Structure (WBS).
  • How to create a Project Schedule Network Diagram.
  • What is the Critical Path Method (CPM) and how to determine the Critical Paths of the project?
  • Determine the critical path using the Activity on Arrow (AOA)/ Arrow Diagramming Method (ADM).
  • Determine the critical path using Activity on Node (AON)/ Precedence Diagram (PDM).
  • How to calculate the Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF) for the activities.
  • How to calculate the Total Float (TF) and Free Float (FF) for the activities.
  • How to use Microsoft Project.

Prerequisites

  • In this course, you will learn project schedule management from zero to hero. No previous experience is required.

Project Schedule Management (Critical Path method)

Curriculum

Check out the detailed breakdown of what’s inside the course

Course Overview

1 Lectures
  • play icon Course Overview 01:40 01:40

Introduction to Network Diagram

4 Lectures
Tutorialspoint

Arrow Diagramming Method (ADM)

5 Lectures
Tutorialspoint

Precedence Diagram (PDM) /Activity on Node

4 Lectures
Tutorialspoint

Example on (AON) with different types of relationship between the activities

3 Lectures
Tutorialspoint

Instructor Details

Fuad ABUTAHA

Fuad ABUTAHA

Fuad ABUTAHA is an Assistant Professor at the Department of Civil Engineering. Abutaha holds a Ph.D. degree in Construction Technology & management. Master in Construction Management.

Abutaha is an engineer who embraces modern principles and practices of Civil Engineering specifically in concrete technology and construction management. Researcher with 9 years of experience in the concrete laboratory, experimental design, supervision of research students, and edit materials for publication at high-ranked journals. Experienced in managing research projects from conception to completion.

Abutaha has published several refereed publications and collaborated as a reviewer for different international scholarly journals. The current research focuses on the production of sustainable concrete.

Course Certificate

Use your certificate to make a career change or to advance in your current career.

sample Tutorialspoint certificate

Our students work
with the Best

Related Video Courses

View More

Annual Membership

Become a valued member of Tutorials Point and enjoy unlimited access to our vast library of top-rated Video Courses

Subscribe now
Annual Membership

Online Certifications

Master prominent technologies at full length and become a valued certified professional.

Explore Now
Online Certifications

Talk to us

1800-202-0515